• News
  • Press Releases
  • Renewable News
  • Wind

Regular customer Sancak Enerji issues follow-up order for 24 MW in Turkey to the Nordex Group


Hamburg, 1 October 2020. End of September, the Nordex Group received a 24 MW order from its regular customer Sancak Enerji in Turkey. For the “Baglar-3” wind farm, the Nordex Group will supply five N133/4800 strong-wind turbines. The order also includes a Premium Service contract over a ten-year term.

The “Baglar-3” wind farm will be built in the Konya province, near its provincial capital of the same name, about 200 kilometres south of Ankara. Due to the very humid and cold winters at the site, the Nordex Group will supply the turbines in the Cold Climate Version (CCV). The N133/4800 will be installed on tubular steel towers with hub heights of 110 meters. With a mean annual wind speed of 8 meters per second, the strong-wind turbines are ideal for the location.

Installation will begin in summer of 2021. The Nordex Group will purchase the rotor blades, anchor cages and towers for the turbines locally in Turkey. As a result of this local production, Sancak Enerji – like all Nordex Group customers in Turkey – will benefit from a higher feed-in tariff.

“Baglar-3” is the third wind farm that the Nordex Group will equip with turbines for Sancak Enerji. In 2014, the Group supplied six N117/3000 turbines for the Urla wind farm, and in 2015, 22 N117/2400 turbines for the Yahyali wind farm.

To read the full content,
please download the PDF below.