• News
  • Press Releases
  • Renewable News
  • Solar

REC installed X Link® SAM for PV module lamination control


We are proud to announce the installation of LayTec’s semi-automated mapping system X Link® SAM at REC in Singapore!
The tool measures the degree of cross-linking at predefined positions on the module. The measured data is presented as color maps that show the uniformity of the curing state of the encapsulant across the whole module. With a measurement time of less than one minute per point, X Link® SAM allows a fast feed-back on homogeneity in the lamination process and quick reaction on production issues. In delivery control, the tool checks the quality of the encapsulation, spotting quality issues at a glance. The whole measurement procedure is non-destructive and does not affect the functionality of the tested modules.

Learn more about X Link at laytec.de/xlink or make an appointment with us at one of these trade fairs:
– Renewable Energy India Expo in Greater Noida, India (at the booth of our distribution partner Bergen

Associates) on 7 – 9 September 2016

– PV Days in Halle/Saale, Germany on 27 – 28 September 2016

– Intersolar India in Mumbai, India (at the booth of our distribution partner Bergen Associates) on 19 – 21 October 2016

To read the full content,
please download the PDF below.