• News
  • Press Releases
  • Renewable News
  • Wind

Iberwind extends full scope service contracts with the Nordex Group for 290 MW in Portugal


Hamburg, 19 September 2019. Iberwind, one of the leading wind turbine operators in Portugal, is extending its service contracts with the Nordex Group for 132 of its turbines. As part of a Premium Service contract the Nordex Group will be handling the service and maintenance of 110 N90/2500 and N90/2300 turbines and 22 N60/1300 machines until 2025. The extended service contract for 290 MW covers 70 percent of the wind capacity installed in Portugal by the Nordex Group. The first Nordex turbines for Iberwind were installed in 2001.

“The service contract with the Nordex Group is a very important factor in adapting our operational costs to the current needs while at the same time guaranteeing our availability and quality targets. The prolongation of a long-standing successful partnership with the original manufacturer to service our turbines ensures that this is the case,” says Rui Maia, Iberwind COO.

To read the full content,
please download the PDF below.