Wittenberg/Germany, 6 May 2019 — Europe’s first gigafactory for battery storage systems is being put into operation in Lutherstadt Wittenberg, Germany. Tesvolt, a manufacturer of energy storage systems for industry and commerce, is working to establish new production facilities for lithium storage systems with an annual production capacity of over one gigawatt hour (GWh). Innovations in the production process ensure that the storage systems can be both flexibly and efficiently mass produced. Tesvolt is financing its multimillion-euro investment in the gigafactory without any outside funding, while the EU will lend its support merely to finance around 10 percent of the production line costs. The new production line, warehouse and offices will be fully supplied with solar energy.
Press photos are available here: https://www.tesvolt.com/en/presse/europe%E2%80%99s-first-gigafactory-for-battery-storage-systems-__prr35.html
The first phase of renovation yielding 12,000 sqm of floor space will be finished in June, and by the final phase, annual production will have reached over one GWh in an area of 20,000 sqm. By then, it is estimated that the number of employees will have risen from today’s 60 to between 100 and 120.
“The world market for stationary energy storage systems has already reached a total capacity of 16 GWh. Europeans are calling for an end to harmful coal-fired power plants and diesel scandals. They want a future free of environmental disasters,” says Daniel Hannemann, who founded Tesvolt five years ago with partner Simon Schandert. “We want the gigafactory to be our contribution to reaching this goal, making clean and affordable energy possible anywhere in the world.”
Innovations in production facilities
The technology for the factory’s new semi-automated production line comes from teamtechnik, a mechanical engineering company known for equipping many reputable automobile manufacturers with production and testing lines. Well-versed in both hardware and software, teamtechnik’s cooperation ensures efficient and safe serial production of battery storage systems. Every battery module will be automatically tested for full functionality, and data from each process step will be recorded for seamless retracing capability.
Carbon-neutral production facilities
The gigafactory is designed for the fully carbon-neutral production of Tesvolt battery storage systems. A photovoltaic installation with a 200 kWp power output will supply the electricity needed for the offices and storage system production. Any excess electrical energy will be stored in the factory’s own Tesvolt batteries, which will have a capacity of 350 kWh. Tesvolt will also employ innovative high-temperature heating pump technology, reliant exclusively on a natural refrigerant, so that even the facility’s heating system will run on solar power.
An agile office concept
The building complex will also house the new office spaces, which are set to be occupied in June. A year ago, Tesvolt introduced an agile organization structure — meaning no more hierarchies. Any and all decisions are made as a team. “Our new office layout reflects this — a generous, open floorplan complemented with many collaboration spaces and quiet zones. We want everyone to feel comfortable here. For us, that is work 2.0,” says co-founder Simon Schandert. “We don’t want to mindlessly process; we want to create innovative solutions. The agile organization makes us more efficient, enabling us to better respond to the rapidly changing battery market.”
As part of the Intersolar Europe exhibition in Munich, Tesvolt will be showcasing its products at the energy storage exhibition ees from 15–17 May 2019.
Exhibition booth: Booth 430 in hall B1
About Tesvolt
Tesvolt specializes in commercial battery storage systems. The innovative company from Lutherstadt Wittenberg produces storage systems with state-of-the-art prismatic lithium battery cells from Samsung SDI, based on nickel manganese cobalt oxide. Tesvolt storage systems function just as well at low voltage as at high voltage, and can be connected to all energy producers: sun, wind, water, biogas and combined heat and power — on-grid and off-grid. All storage systems are produced at Tesvolt’s manufacturing facility in Germany.
Tesvolt was honoured with the 2018 German Entrepreneur Award for Rising Stars. The company already received The smarter E Award in the Outstanding Projects category as well as the international award for rural electrification (ARE) for a project supplying off-grid energy to an avocado farm in southwest Australia.
- News
- Press Releases
- Renewable News
- Solar
More from across PES
Airborne Wind Energy developer Kitemill receives €2.5m cash boost from EIC (European Innovation Council) to accelerate commercialisation
Voss, Norway, July 22, 2024 – Airborne Wind Energy (AWE) developer Kitemill has secured €2.5million from the EIC (European Innovation Council) to accelerate the commercial launch of its novel technology. The multi-million-euro cash injection marks a significant milestone for Kitemill and its pioneering KM2 system (*see notes to editors) which received commendation from the EIC… Read more »
Nordex Group to offer N169/5.X turbine for the US market
169 m rotor diameter Power rating up to 5.5 MW Hamburg, 22 July 2024. The Nordex Group is expanding its product portfolio in the 5 MW segment and is launching a turbine variant of the proven Delta4000 platform, which is specially tailored to the requirements of the US market. The N169/5.X has a rotor… Read more »
ARESCA calls for wind energy experts to support the national adoption of industry standards
The American Renewable Energy Standards and Certification Association (ARESCA) is calling for experts who are directly and materially affected parties who are interested in participating as a member of an American National Standards (ANS) consensus body, known as the ARESCA Standards Committee of the Board (SCB), to support the adoption of the following IEC TC 88 standards… Read more »
WORLD BANK GROUP RELEASES REPORT ON OFFSHORE WIND DEVELOPMENT SCENARIOS FOR BRAZIL BASED ON ANALYSIS BY DNV
Porto Alegre, Brazil, 18 July 2024 – The World Bank Group today released a study on “Scenarios for Offshore Wind Development in Brazil” conducted by DNV, the global independent energy expert and assurance provider. This report is one of a series of offshore wind roadmap studies commissioned by the World Bank Group (WBG) under its… Read more »
The UK Government today (July 18) announced the formation of an Onshore Wind Industry Taskforce.
The main aim of the taskforce will be to bring together key players from government, industry, regulatory bodies, the financial sector and other relevant organisations to drive forward the increases in onshore wind deployment needed to meet the UK’s 2030 targets. The taskforce will be chaired jointly by the UK Government’s Secretary of State for… Read more »
Busch Group at the Company Cup in Annecy
This year, staff members from more than 90 European companies participated in the eleventh Company Cup in Annecy, France. From the Maulburg-based Busch Group, 220 employees took part in the sporting competitions. Maulburg, July 18, 2024 – Participants from Pfeiffer Vacuum and Busch Vacuum Solutions competed together for the second time under the motto “One… Read more »
MACQUARIE ASSET MANAGEMENT AGREES TO ACQUIRE ADDITIONAL STAKE IN LYNN AND INNER DOWSING OFFSHORE WIND FARMS
More reliable and cost-effective: Schaeffler optimizes wind turbines using closed loop engineering
Warwickshire council goes against planning officers and turns down major solar farm on the day Labour’s chancellor promises new planning reforms
Online Magazine Reader
- Solar/PV
- Wind
- China