— 13 December, 2022
Nordex Group receives order to supply 94 MW to Brazil
Hamburg, 13 December 2022. The Nordex Group has received an order for N163/5.X turbines from Brazil. The manufacturer is to supply 16 turbines for the 94.4 MW “EOL TODA ENERGIA 2” wind farm for TODA Investimentos do Brasil. The wind farm is to be built in the state of Rio Grande do Norte, near to th...
Read more