The installation procedure of the ECO TLP® system for floating foundations, which is designed for extra-large (XXL) wind turbine generators in deep water, is a patented innovation capable of operating in water depths of up to 2000 meters. PES was keen to gain insight into the technology and the benefits it brings to the offshore wind sector. Chief Technology Officer, Jelte Kymmell, and Chief Executive Officer, Nicole Johnson Murphy were eager to shed light on the subject.
PES: I’m fascinated to learn more about ECO TLP®’s installation process. Am I correct in believing that it has been identified as a preferred solution for 24GW+ of deep water floating arrays worldwide?