The offshore wind industry is projected to produce 228 GW by 2030, enough to power over 68 million homes. These projects will be at greater water depths and with larger wind turbine generators, so the demand for innovative solutions to deliver these projects
has never been greater.
Earlier this year, Heerema Marine Contractors introduced a novel floating wind installation method to the market, designed to upscale the commercialization of offshore floating wind. The company is not unfamiliar with this type of work and the installation of floating offshore structures, with around 70% of the world’s tension-legged platforms (TLPs) installed by Heerema.