• News
  • Press Releases
  • Wind

Nordex Group wins 48 MW order in Poland


Hamburg, 2 November 2022. Wind Energia Sp. z.o.o. has placed an order with the Nordex Group for the supply and installation of 16 N117/3000 turbines for the 48 MW “Nozdrzec” wind farm. The company is a subsidiary of Yevuley Shemesh (YVS) Renewable Energy Ltd., which operates in the field of renewable energy and is based in Israel. The order also includes a Premium Service for the turbines covering a period of 20 years.

The “Nozdrzec” wind farm is being built in the south-east of Poland in the province of Subcarpathia. The N117/3000 turbines will be installed by the Nordex Group as of summer 2023 on tubular steel towers with a hub height of 134 metres. The final turbine is scheduled to go into operation at the end of 2023.

Adam Ofek, YVS Cerac Management CEO says: “Signing with Nordex this agreement in this challenging time is very important milestone for the success of our Nozdrzec wind farm development”.

Patxi Landa, CSO of the Nordex Group: “We are delighted that we are gaining more and more momentum in the Polish market and that we have now been able to win Yevuley Shemesh as a new customer for our Nordex technology.”