News

LiftOff Unveils Revolutionary Major Component Exchange Vessel (MCEV)

Published in: Press Releases, Wind

LiftOff-MCEV-1-MR

LiftOff unveils its revolutionary Major Component Exchange Vessel (MCEV) at the RenewableUK Global Wind Offshore exhibition in London. Designed to meet rising demand for offshore wind turbine maintenance, the MCEV combines LiftOff’s proven up-tower crane technology with capabilities of modern offshore dynamically positioned (DP) vessels and mission equipment. LiftOff will offer turnkey services for major component exchanges using the MCEV.

With a rapidly expanding offshore wind energy market, combined with an aging fleet of installed wind turbines, operators face increasing delays due to limited jack-up and heavy-lift vessel availability. This drives up costs and increases turbine downtime, and threatening LCOE competitiveness.

A Purpose-Built Solution

LiftOff’s MCEV is a purpose-built vessel designed to transport multiple generators and gearboxes, making it ideal for both large-scale and smaller Major Component Exchange (MCE) projects. The MCEV significantly shortens response times and enhances the efficiency of MCE operations.

“With this new vessel, LiftOff is changing the game in the MCE market,” says Eelko May, Managing Director of LiftOff. “The MCEV allows us to scale our services and better support wind farm owners, operators and turbine OEMS across the globe.”

Based on a conventional DP2 vessel, the MCEV features a custom up-tower crane with nacelle-mounted winches, enhancing safety by removing direct load connections to the vessel. The aft deck is equipped with a motion-compensated platform that carries cargo comprised of both crane equipment and wind turbine major components, while a motion-compensated walk-to-work system ensures safe and efficient crew and small component transfers.

Unlike jack-up vessels, the MCEV does not require seabed contact, eliminating the need for pre-arrival site characterization. Its DP2 dynamic positioning system ensures precise station-keeping, even in challenging sea conditions. The vessel’s performance also enables faster transit between turbines and sites, further reducing downtime.

Key Benefits

  • No seabed interaction
  • Faster mobilization and transit reduces turbine downtime
  • Simplified maintenance campaign planning and execution

About LiftOff

Based in the Netherlands, LiftOff is a tech-enabled contractor, providing turnkey exchange services as well as specialized lifting services using proprietary up-tower crane solutions.

For more information please contact: Sjoerd Butter, Sales Manager, [email protected]

Media

Video on Youtube channel: https://www.youtube.com/watch?v=hNuVftjFj_c

https://www.youtube.com/@LiftOff-MCEB.V/videos

More from across PES